The U.S. Army Corps of Engineers (USACE) is scheduled to conduct an inspection of the hydroelectric infrastructure at Canyon Reservoir on June 4. This process requires a complete shutdown of flow from Canyon Dam for a period of time that the USACE anticipates to be approximately 6 hours. No water supply disruption is anticipated and regular releases will resume once the inspection is complete. Recreationalists are advised to check with local outfitters for information on river conditions.